Operation Helltrek:
Mission objective: Brighton to Gatwick train station + liase with armoured personel carrier
ETA : 18.30 hrs.
Failure to achieve the above objective is not an option.
Lock and load.
[NO TWEETING or Tweet under designated code names ONLY]